Glencore Sudbury INO
Following a life-cycle assessment by the original equipment manufacturer (OEM), which identified multiple units requiring replacement, Glencore Sudbury INO engaged BESTECH to conduct a feasibility study for upgrading various Foxboro servers and workstations.
The feasibility study included a detailed review of each server and workstation, along with the OEM’s proposed replacements, to assess integration constraints.
SCOPE
BESTECH developed a comprehensive feasibility report that outlined the upgrade path, provided a capital cost estimate, and proposed a high-level schedule. This was done in close collaboration with Glencore to ensure the upgrades could be integrated seamlessly during planned downtime, taking into consideration the lead times required for hardware procurement.
OUTCOME
The completion of the feasibility study enabled Glencore to understand the scope, cost, and time implications of the upgrades. By coordinating the execution with planned down periods, BESTECH ensured that the upgrades would minimize operational disruptions. This strategic planning allowed for efficient integration of new technology while maintaining the continuous operation of essential systems.