
Project:Mining
Cameco
BESTECH designed a pipe sling device to use in the #1 shaft at Cameco in Cigar Lake, Saskatchewan.
This sling is used to transport 8-12 inch diameter pipe bundles to the underground sites. The design consisted of all mechanical and structural components. BESTECH was also responsible for the fabrication and quality assurance of the project, including the development of an equipment operation manual.