Project:Mechanical

Xstrata

BESTECH was involved in the complete re-design of the client’s smelter process water pump house and booster pump house.

This included the installation of two priming pumps and six VFD controlled 350 hp primary pumps. It also involved the complete re-design and installation of the power distribution system. BESTECH completed the programmable logic controller (PLC) and human machine interface (HMI) programming and led the commissioning and construction management.