Electrical & Instrumentation
BESTECH is the leading provider of electrical and instrumentation engineering services for mining projects in Ontario.
Our services range from feasibility studies, designs, capital and operating estimates, energy optimization, power distribution, electrical distribution, trade-off assessments, networking, instrument selection, motor control centres (MCC), and retrofits.
As a passionate team leading the charge to innovation, we conduct studies for battery-electric vehicles (BEVs). These studies include usage in mines, operating philosophies, charging infrastructure requirements, energy and power demand, and the Green House Gas (GHG) reduction in emissions.
Global mining and industrial clients rely on our team to deliver successful projects that minimize energy use and reduce electrical costs while maintaining a safe work environment.
Qualifications
2019-03-07 19:59:42
Power System Studies
2017-03-07 20:35:43
SO2 Clean Production Facility EPCM Design and Build
2017-03-07 19:55:55
Copper Cliff No.4 Substation Replacement FEL 3 Study and Detailed Engineering
2017-03-07 17:16:28
Business Intelligence Program for Glencore Sudbury INO
2016-03-07 17:08:37
Victoria Mine Power Infrastructure Project
2016-03-07 17:05:50
Stench Gas System Design for Coleman and Fraser Mines
2016-03-07 16:31:04
Fraser Mine, Surface Fans Detailed Engineering
2015-03-07 20:33:29
Totten Mine, Underground Process Water Improvements Study and Design
2015-03-07 17:20:08
Lac Des Iles Mine, Dewatering System Design Detailed Engineering
2015-03-07 17:18:32
Business Objects Reporting for Glencore Sudbury INO
2015-03-07 17:14:47
OSB Plant to Wood Pelletizer Conversion
2015-03-07 17:13:52
Young Davidson, Ventilation Engineering Studies
2014-03-07 20:30:52
Totten Mine Network Technical Engineering Support
2014-03-07 19:58:29
Copper Cliff No.6 and No.8 Substation Replacement, FEL 1, 2, and 3 Studies
2014-03-07 17:21:32
CCNR, Pellet Decomposer Controls
2013-03-07 17:12:23
Overflow Automation Support Projects for Nickel Refinery and Stobie Mine
2013-03-07 17:11:25
Clarabelle Mill PO Dump Valve Automation
2013-03-07 16:28:18
Pipe Slinging Device Design for Cameco’s Cigar Lake Mine
2012-03-07 17:07:35
General Offices, PCN Security Reparations
2012-03-07 16:26:16
High-availability Network Topology Project for Mine Site
2011-03-07 16:27:23
Wireless Upgrade Security Enhancements
2010-03-07 16:10:05
Smelter Compressed Air Upgrades
2010-03-07 16:09:08
Totten Mine, Underground Wireless
2010-03-07 16:07:27
Energy Efficiency Projects Preliminary Detailed Engineering
2009-03-07 16:04:38
Custom Feed Calciner Plant
2009-03-07 16:03:25
VCS Integration at Coleman Mine
2008-03-07 15:59:36
Surface Intake Fan Installation at Nickel Rim South
2007-03-07 16:01:17
Smelter Process Water Upgrades
2007-03-07 15:57:29
Converter Controls and Remote Operations at Xstrata Nickel
2007-03-07 15:55:09
Smelter Roasters No.2, No.3, & No.4 Upgrades
2005-03-07 15:51:02
Custom Feed Calciner Plant for Xstrata Nickel
2004-03-07 15:44:33
7.5 MW Cooling Plant at Kidd Mine
2002-02-26 19:56:23
Kidd Mine, Detailed Engineering Automation
Alain Richard
Senior Electrical Engineer