Structural
BESTECH’s structural engineering department is known for its innovative and collaborative design solutions paired with practicality, knowledge, and hands-on experience.
Clients engage with our structural engineers and designers because they offer extensive practical experience in mining and industrial applications. We deliver sound structural designs that withstand harsh industrial environments.
At BESTECH, we understand how important sound structures are to your business operations. Our structural engineering professionals provide structural design, modifications, additions, and assessments. For new structural projects, we deliver creative solutions that will support productivity for years to come. For existing structures, we tackle their service life. We prioritize the health and safety of all personnel.
Unique Solutions
Our team is willing to partner with clients to produce custom solutions that best fit their current and future needs.
Up for a Challenge
Here at BESTECH, we pride ourselves on being able to solve even the most complex problems. The nature of our unique and collaborative solutions allows us to tackle challenging projects across industries with success.
Qualifications
- New Buildings
- Retrofits/ Additions to Existing Buildings
- Rehabilitation of Existing Buildings/ Structures
- Maintenace Platforms
- Pre-Engineered Building Specifications
- High-Pressure Vent Walls
- Mine Infrastructure
- Building Foundations
- Heavy Equipment Foundations
- Dams & Retaining Walls
- Headframe reviews
- Mine Shaft reviews
- Building reviews
2024-06-28 18:33:24
Annual Hoisting Plant Inspection Program
2024-06-28 18:06:30
Annual Headframe Inspection
2024-06-26 18:36:36
Haulage Simulation
2024-06-26 18:00:47
Time Study
2023-06-28 18:42:11
Underground Mine Water Management Study
2023-06-28 18:27:02
Finite Element Analysis (FEA) of Hoist Components
2023-06-28 16:58:24
Battery Electric Vehicle (BEV) Study
2023-06-28 16:50:15
Battery Electric Vehicle (BEV) Mine Fleet Analysis
2023-06-27 20:14:42
Black Mass Pilot Project
2023-06-27 19:54:41
Hoist Replacement
2023-06-26 18:49:40
Crystallizer Building
2023-06-26 18:42:48
Refinery Restart
2023-06-26 18:32:48
Underground Main Zone Expansion
2023-06-26 18:24:54
Concentrate Receiving Facility (CRF) Baghouse Replacement
2023-06-26 18:21:16
Ventilation Support Detailed Engineering
2023-06-26 18:16:15
Ore-Handling Programmable Logic Controller (PLC) Upgrade
2023-06-26 18:10:22
Engineering Services Contract
2023-06-26 17:49:06
Mine Shaft Alimak 2.0
2022-06-27 20:01:58
Pole Line Upgrade
2022-06-26 20:04:36
Seismic Re-Entry Review & Development
2022-06-26 19:58:39
Paste Plant Engineering
2022-06-26 19:34:21
2220L Dewatering Pumps Upgrade
2022-06-26 19:28:57
Product Conveyor Ventilation Study
2021-06-28 18:18:09
Generating Station Upgrade
2021-06-28 17:51:08
Mining & Ore Body Capacity Study
2021-06-28 16:37:36
Underground Mining Operations Electrification & Energy Balance Studies
2021-06-27 17:56:24
Cage Hoist Replacement Front-End Engineering Design (FEL 3)
2020-06-28 17:44:17
Engineered Lifting Plans
2020-06-28 17:38:55
Tower & Mill Preliminary Economic Assessment
2020-06-28 17:16:34
Dust Capture Front-End Engineering & Design (FEL 3)
2020-06-27 19:45:36
Technology Roadmap
2020-06-26 17:55:12
Arc Flash Study
2019-03-07 19:59:42
Power System Studies
2018-06-27 19:33:06
Mine Pre-Feasibility Study
2018-06-27 17:49:04
115kV to 25kV Substation Detailed Engineering & Substation
2017-03-07 20:35:43
SO2 Clean Production Facility EPCM Design & Build
2017-03-07 19:55:55
Substation Replacement Study & Front End Engineering Design (FEL 3)
2017-03-07 17:16:28
Business Intelligence Program
2016-06-27 17:11:54
115 kV & 27.6 kV Power Distribution Detailed Design
2016-03-07 17:08:37
Power Infrastructure Project
2016-03-07 17:05:50
Stench Gas System Design
2016-03-07 16:31:04
Surface Fans Detailed Engineering
2015-03-07 20:33:29
Underground Process Water Improvements Study & Design
2015-03-07 17:20:08
Dewatering System Design Detailed Engineering
2015-03-07 17:18:32
Business Objects Reporting
2015-03-07 17:14:47
OSB Plant to Wood Pelletizer Conversion
2015-03-07 17:13:52
Ventilation Engineering Studies
2014-03-07 20:30:52
Network Technical Engineering Support
2014-03-07 19:58:29
Substation Replacement Feasibility Study (FEL1) to Front-End Engineering & Design (FEL 3)
2014-03-07 17:21:32
Pellet Decomposer Controls
2013-03-07 17:12:23
Automation Support Project
2013-03-07 17:11:25
Dump Valve Automation
2013-03-07 16:28:18
Pipe Slinging Device Design
2012-03-07 17:07:35
Personal Connection Network Security Reparations
2012-03-07 16:26:16
High-Availability Network Topology Project
2011-03-07 16:27:23
Wireless Upgrade Security Enhancements
2010-03-07 16:10:05
Smelter Compressed Air Upgrades
2010-03-07 16:09:08
Underground Wireless
2010-03-07 16:07:27
Energy Efficiency Projects Preliminary Detailed Engineering
2009-03-07 16:04:38
Custom Feed Calciner Plant
2009-03-07 16:03:25
Ventilation Control System (VCS) Integration
2008-03-07 15:59:36
Surface Intake Fan Installation
2007-03-07 16:01:17
Smelter Process Water Upgrades
2007-03-07 15:57:29
Converter Controls & Remote Operations
2007-03-07 15:55:09
Smelter Roaster Upgrades
2005-03-07 15:51:02
Custom Feed Calciner Plant Construction & Operational Support
2004-03-07 15:44:33
7.5 MW Cooling Plant Design & Installation
2002-02-26 19:56:23
Detailed Engineering Automation
![Alison Cuda](https://www.bestech.com/wp-content/themes/bessy/gfx/profiles/alison-cuda.jpg)
Alison Cuda
Manager, Structural Engineering Services